The Polytechnic is functioning in a well laid out campus with shady trees. The classrooms, Laboratories and all student amenities are housed in a 12,000 square feet of Buildings. A well-planned layout of playground supplements the extra curricular activities of the students.
The college has a Boys Hostel, Computer Lab, Library & Reading Room, Language Laboratory, Boys Hostel, CCTV Security, Electric Supply, Group Insurance, Insurance for students, Fire and safety Certificate, Backup Electric supply, Notice Boards, Potable water supply, Projectors in classrooms, Staff Quarters, Auditorium, Innovation Cell/Club, Playground and more.
Land Registered with | Revenue | Land Place Area 1 in acres | 63 | ||||
Land ownership details | Govrnment Lnad | Land Place Area 2 in acres | NA | ||||
Total area in acres | 63 | Land Place Area 3 in acres | NA | ||||
Land Registered Date | 2/2/1983 | Land Use Certificate issued by | Tehsidar | ||||
Land Use Certificate Date | 2/2/1983 | Latitude and Longitude | Latitude-24,3,49 Longitude- 82, 35, 18 | ||||
Mortgage Details (if any ) | No | Purpose of Mortgage | No | ||||
FSI | Data Not Provided by the Institute | Bulid up Area (Sgm) | |||||
Additional land for Merger or New Program | |||||||
Other land Details | |||||||
Sr.No. | 1 | Land Registration No. | Governmment land | ||||
Date of Registration | 2/2/1983 | Area of Land (acres | 1 | ||||
Khasra Number | government Land | Plot Number, Survey Number | Governmment land | ||||
Land Situated at | Pachore | Land Registration in the name of | yes | ||||
Type of ownership ( Sales deed/Gift deed/Govt/Private Lease | Ownership | Land Use Certificate issued by | Yes | ||||
In case of Private Lease-Name of the Leaser | Name of the Leasee | ||||||
Land use Certificate issuing Authority | Teshsildar | Is the Land Mortgaged | no | ||||
Details of Land if the land is Mortgaged | Data Not Provided by the Institute | Land required at the time of First AICTE approved (In Acres) | 5 | ||||
Land avaliable at the time of First AICTE approval (In Acres) | 63 | ||||||
Building Details | |||||||
Buliding Status | Available | Total built up Area (Sqm) Planned | 10000 | ||||
Total built up Area (Sqm) ready | 9646 | Total Carpet Area (Sqm) Instructional-ready | 6646 | ||||
Total Carpet Area (Sqm) Administrative-Ready | 747 | Total Carpet Area (Sqm) Amenities-ready | 3000 | ||||
Access and Circulation Area (Sqm) | Data Not Provided by the Institute | Activities in the building other than courses approved by AICTE | MES Program | ||||
Whether Tollet Area is maintained as per National Building Code(NBC) Norms? | Data Not Provided by the Institute | Whether Access and circulation Area is maintained as per National Bullding code (NBC) Norms? | Data not provided by the Institute | ||||
Funds Position for Building Construction(Rs in Lakhs) | |||||||
Loans | Data Not Provided by the Institute | own share | Data not provided by the Institute | Funds allocated | Data Not Provided by the Institute | ||
Other Building Details | |||||||
Programme and Courses | |||||||
Sr.No. | 1 | Coures Unique Id | 1-1591003116 | Programme | Engineering Technology | ||
Level | DIPLOMA | Coures | Mechanical Engineering | Shift | 1st Shift | ||
FT/PT | Full Time | Started in | 1984 | Applying For | EoA only | ||
Course Duration | 3 | Current Intake ( 2018-19) | 60 | Applying For intake (2019-20) | 60 | ||
NRI | Not interest | University Board | Rajiv Gandhi Proudyogiki Vishwvidyalaya Bhopl | PIO/FN/Gulf Quota approval statuts OCI | Not interested | ||
Twining Program Request | Not interest | NBA Accreditation status (As on 10th April 2018 | no | ||||
Sr.No. | 2 | Course Unique Id | 1-1591003219 | Programme | Engineering Technology | ||
Level | DIPLOMA | Courses | Electrical Engineering | Shift | 1st Shift | ||
FT/PT | Full Time | Started in | 1983 | Applying For | EoA only | ||
Course Duration | 3 | Current Intake ( 2018-19) | 60 | Applied for Intake (2019-20) | 60 | ||
NRI | Not interest | University Board | Rajiv Gandhi Proudyogiki Vishwvidyalaya Bhopl | PIO/FN/Gulf Quota approval statuts OCI | Not interested | ||
Twining Program Request | Not interest | NBA Accreditation status (As on 10th April 2018 | No | ||||
Sr.No. | 3 | Course Unique Id | 1-1591003280 | Programme | Engineering Technology | ||
Level | DIPLOMA | Course | Computer Science & Engineering | Shift | 1st Shift | ||
FT/PT | Full Time | Started in | 2006 | Applying for | EoA only | ||
Course Duration | 3 | Current Intake ( 2018-19) | 60 | Applied for Intake (2019-20) | 60 | ||
NRI | Not interested | University Board | Rajiv Gandhi Proudyogiki Vishwvidyalaya Bhopl | PIO/FN/Gulf Quota approval statuts OCI | Not interested | ||
Twining Program Request | Not interest | NBA Accreditation status (As on 10th April 2018 | No | ||||
Sr.No. | 4 | Course Unique Id | 1-1591003333 | Programme | Engineering Technology | ||
Level | DIPLOMA | Course | Elctronics & Tele-Communication Engineering | Shift | 1st Shift | ||
FT/PT | Full Time | Started in | 2009 | Applying for | EoA only | ||
Course Duration | 3 | Current Intake ( 2018-19) | 60 | Applied for Intake (2019-20) | 60 | ||
NRI | Not interested | University Board | Rajiv Gandhi Proudyogiki Vishwvidyalaya Bhopl | PIO/FN/Gulf Quota approval statuts OCI | Not interested | ||
Twining Program Request | Not interest | NBA Accreditation status (As on 10th April 2018 | No | ||||
Sr.No. | 5 | Course Unique Id | 1-1591003448 | Programme | Engineering Technology | ||
Level | DIPLOMA | Course | Mining & Mine Surveyeing | Shift | 1st Shift | ||
FT/PT | Full Time | Started in | 2006 | Applying for | EoA only | ||
Course Duration | 3 | Current Intake ( 2018-19) | 60 | Applied for Intake (2019-20) | 60 | ||
NRI | Not interested | University Board | Rajiv Gandhi Proudyogiki Vishwvidyalaya Bhopl | PIO/FN/Gulf Quota approval statuts OCI | Not interested | ||
Twining Program Request | Not interest | NBA Accreditation status (As on 10th April 2018 | No | ||||
Sr.No. | 6 | Course Unique Id | 1-1591104795 | Programme | Engineering Technology | ||
Level | DIPLOMA | Course | Civil Engineering | Shift | 1st Shift | ||
FT/PT | Full Time | Started in | 2009 | Applying for | EoA only | ||
Course Duration | 3 | Current Intake ( 2018-19) | 45 | Applied for Intake (2019-20) | 45 | ||
NRI | Not interested | University Board | Rajiv Gandhi Proudyogiki Vishwvidyalaya Bhopl | PIO/FN/Gulf Quota approval statuts OCI | Not interested | ||
Twining Program Request | Not interest | NBA Accreditation status (As on 10th April 2018 | No | ||||
Sr.No. | 7 | Course Unique Id | 1-1612965134 | Programme | Engineering Technology | ||
Level | DIPLOMA | Course | Mechanical Engineering | Shift | 1st Shift | ||
FT/PT | Full Time | Started in | 2006 | Applying for | EoA only | ||
Course Duration | 4 | Current Intake ( 2018-19) | 30 | Applied for Intake (2019-20) | 30 | ||
NRI | Not interested | University Board | Rajiv Gandhi Proudyogiki Vishwvidyalaya Bhopl | PIO/FN/Gulf Quota approval statuts OCI | Not interested | ||
Twining Program Request | Not interest | NBA Accreditation status (As on 10th April 2018 | No | ||||
Sr.No. | 8 | Course Unique Id | 1-1613002067 | Programme | Engineering Technology | ||
Level | DIPLOMA | Course | Electrical Engineering | Shift | 1st Shift | ||
FT/PT | Full Time | Started in | 2006 | Applying for | EoA only | ||
Course Duration | 4 | Current Intake ( 2018-19) | 30 | Applied for Intake (2019-20) | 30 | ||
NRI | Not interested | University Board | Rajiv Gandhi Proudyogiki Vishwvidyalaya Bhopl | PIO/FN/Gulf Quota approval statuts OCI | Not interested | ||
Twining Program Request | Not interest | NBA Accreditation status (As on 10th April 2018 | No | ||||
Programme and Courses to Change Course Name | |||||||
Dual Degree/Intergrated Course Details | |||||||
Data not entered by Institute | |||||||
Voxational Course Details | |||||||
Data not entered by Institute | |||||||
Instructional Area |
Sr.No | Programme | Level | Building No. | Building Name | Room Type | Room No. | Average Crpet Area (Sqm) | Flooring | Wall & Painting | Elec & lighting | Furniture & Fixtures | |
1 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Laboratory | B-15 | 87.43 | Ready | Ready | Ready | Ready | |
2 | Engineering and Technology | Diploma | 34 | GPC WAIDHA N | Laboratory | B-16 | 117.04 | Ready | Ready | Ready | Ready | |
3 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Laboratory | B-17 | 117.04 | Ready | Ready | Ready | Ready | |
4 | Engineering and Technology | Diploma | 34 | GPC WAIDHA N | Workshop | BLACKSMIT HY SHOP | 116.1 | Ready | Ready | Ready | Ready | |
5 | Engineering and Technology | Diploma | 34 | GPC WAIDHA N | Laboratory | CAD CAM LAB | 75.68 | Ready | Ready | Ready | Ready | |
6 | Engineering and Technology | Diploma | 34 | GPC WAIDHA N | Workshop | CARPENTARY SHOP | 116.1 | Ready | Ready | Ready | Ready | |
7 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Classroom | E-8 | 76.56 | Ready | Ready | Ready | Ready | |
8 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Classroom | E-9 | 76.56 | Ready | Ready | Ready | Ready | |
9 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Classroom | E-1 | 156.64 | Ready | Ready | Ready | Ready | |
10 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Laboratory | E-14 | 98.2 | Ready | Ready | Ready | Ready | |
11 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Laboratory | E-16 | 116.2 | Ready | Ready | Ready | Ready | |
12 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Laboratory | E-17 | 117.04 | Ready | Ready | Ready | Ready | |
13 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Laboratory | E-18 | 117.04 | Ready | Ready | Ready | Ready | |
14 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Classroom | E-2 | 76.56 | Ready | Ready | Ready | Ready | |
15 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Classroom | E-3 | 76.56 | Ready | Ready | Ready | Ready | |
16 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Classroom | E-4 | 76.56 | Ready | Ready | Ready | Ready | |
17 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Drawing Hall | E-8 | 148.2 | Ready | Ready | Ready | Ready | |
18 | Engineering and Technology | Diploma | 34 | Electrical wing | Laboratory | ELECTRICAL POWER LAB | 116.16 | Ready | Ready | Ready | Ready | |
19 | Engineering and Technology | Diploma | 34 | Electrical wing | Laboratory | ELECTRONICS LAB | 98.2 | Ready | Ready | Ready | Ready | |
20 | Engineering and Technology | Diploma | 34 | GPC WAIDHA N | Workshop | FITTING SHOP | 161.1 | Ready | Ready | Ready | Ready | |
21 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Laboratory | G-10 | 116.56 | Ready | Ready | Ready | Ready | |
22 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Laboratory | G-12 | 155.76 | Ready | Ready | Ready | Ready | |
23 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Classroom | G-13 | 76.56 | Ready | Ready | Ready | Ready | |
24 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Classroom | G-14 | 76.56 | Ready | Ready | Ready | Ready | |
25 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Classroom | G-3 | 76.56 | Ready | Ready | Ready | Ready | |
26 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Laboratory | G-4 | 117.04 | Ready | Ready | Ready | Ready | |
27 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Laboratory | G-5 | 117.04 | Ready | Ready | Ready | Ready | |
28 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Classroom | G-6 | 76.56 | Ready | Ready | Ready | Ready | |
29 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Classroom | G-7 | 76.56 | Ready | Ready | Ready | Ready | |
30 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Classroom | G-8 | 156.64 | Ready | Ready | Ready | Ready | |
31 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Classroom | G-9 | 155.76 | Ready | Ready | Ready | Ready | |
32 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Laboratory | M-6 | 96.44 | Ready | Ready | Ready | Ready | |
33 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Laboratory | M-7 | 116.56 | Ready | Ready | Ready | Ready | |
34 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Classroom | M-8 | 116.16 | Ready | Ready | Ready | Ready | |
35 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Laboratory | M-9 | 116.16 | Ready | Ready | Ready | Ready | |
36 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Classroom | M-10 A | 76.56 | Ready | Ready | Ready | Ready | |
37 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Classroom | M-10 B | 76.56 | Ready | Ready | Ready | Ready | |
38 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Laboratory | M-11 | 116.56 | Ready | Ready | Ready | Ready | |
39 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Classroom | M-12 | 155.76 | Ready | Ready | Ready | Ready | |
40 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Classroom | M-13 | 76.56 | Ready | Ready | Ready | Ready | |
41 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Laboratory | M-14 | 116.56 | Ready | Ready | Ready | Ready | |
42 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Seminar Hall | M-4 | 146.2 | Ready | Ready | Ready | Ready | |
43 | Engineering and Technology | Diploma | Data Not Provided by the Institute | Data Not Provided by the Institute | Tutorial Room | M-5 | 146.2 | Ready | Ready | Ready | Ready | |
44 | Engineering and Technology | Diploma | 34 | GPC WAIDHA N | Workshop | MACHINE SHOP | 161.1 | Ready | Ready | Ready | Ready | |
45 | Engineering and Technology | Diploma | 34 | GPC WAIDHA N | Workshop | MOULDING SHOP | 161.1 | Ready | Ready | Ready | Ready | |
46 | Engineering and Technology | Diploma | 34 | GPC WAIDHA N | Workshop | WELDING SHOP | 161.1 | Ready | Ready | Ready | Ready | |
47 | Engineering and Technology | Diploma | 34 | GPC WAIDHA N | Workshop | WORK SHOP-1 | 161.1 | Ready | Ready | Ready | Ready | |
48 | Engineering and Technology | Diploma | 34 | GPC WAIDHA N | Workshop | WORK SHOP-2 | 161.1 | Ready | Ready | Ready | Ready | |
49 | Engineering and Technology | Diploma | 34 | GPC WAIDHA N | Workshop | WORK SHOP-3 | 161.1 | Ready | Ready | Ready | Ready | |
50 | Engineering and Technology | Diploma | 34 | GPC WAIDHA N | Workshop | WORK SHOP-4 | 161.1 | Ready | Ready | Ready | Ready | |
51 | Engineering and Technology | Diploma | 34 | GPC WAIDHA N | Workshop | WORK SHOP-5 | 161.1 | Ready | Ready | Ready | Ready | |
Instructional Area Common Facilities | ||||||||||||
Sr.No | Building No. | Building Name | Room Type | Room Id | Area (Sqm) | Flooring | Wall & Painting | Elec & lighting | Furniture & Fixtures | |||
1 | 34 | GPC, Waidhan | computer centre | B-1 | 77.43 | Ready | Ready | Ready | Ready | |||
2 | 34 | GPC, Waidhan | computer centre | B-2 | 37.38 | Ready | Ready | Ready | Ready | |||
3 | 34 | GPC, Waidhan | computer centre | B-3 | 117.04 | Ready | Ready | Ready | Ready | |||
4 | 34 | GPC, Waidhan | Library & Reading room | L-1 | 319.8 | Ready | Ready | Ready | Ready | |||
5 | 34 | GPC, Waidhan | computer centre | L-3 | 216.56 | Ready | Ready | Ready | Ready | |||
6 | 34 | GPC, Waidhan | Language Laboratory | L-4 | 66 | Ready | Ready | Ready | Ready | |||
Administrative Area | ||||||||||||
Sr.No | Building No. | Building Name | Room Type | Room Id | Area (Sqm) | Flooring | Wall & Painting | Elec & lighting | Furniture & Fixtures | |||
1 | Data Not Provided by the Institute | Data Not Provided by the Institute | Maintenance | E-1 | 39.6 | Ready | Ready | Ready | Ready | |||
2 | Data Not Provided by the Institute | Data Not Provided by the Institute | Cabin for Head of Dept. | E-2 | 36.96 | Ready | Ready | Ready | Ready | |||
3 | Data Not Provided by the Institute | Data Not Provided by the Institute | Cabin for Head of Dept. | E-3 | 17.64 | Ready | Ready | Ready | Ready | |||
4 | Data Not Provided by the Institute | Data Not Provided by the Institute | Cabin for Head of Dept. | E-4 | 68.88 | Ready | Ready | Ready | Ready | |||
5 | Data Not Provided by the Institute | Data Not Provided by the Institute | Cabin for Head of Dept. | E-5 | 17.64 | Ready | Ready | Ready | Ready | |||
6 | Data Not Provided by the Institute | Data Not Provided by the Institute | Housekeeping | E-9 | 15 | Ready | Ready | Ready | Ready | |||
7 | Data Not Provided by the Institute | Data Not Provided by the Institute | Principal Director office | G-1 | 65.06 | Ready | Ready | Ready | Ready | |||
8 | Data Not Provided by the Institute | Data Not Provided by the Institute | Exam control office | G-1,1 | 30.15 | Ready | Ready | Ready | Ready | |||
Computational Facility | ||||||||||||
Sr.No | Legal System software | Legal Apllication software | Internet Bandwidth in Mbps | Internet Contention Ratio | PCs/Laptop exclusively available to students | PCs/Laptop exclusively available in Administrative office | No. of PCs/Laptop available in Library | No. of PCs/Laptop in language lab | PCs/Laptop available to faculty members | |||
1 | 4 | 22 | 10 | 1:02 | 140 | 5 | 5 | 0 | 8 | |||
Hostel Facility | ||||||||||||
Sr.No | No. of rooms having single bed/room & Area of room in sq.m | Building No. | Name of Building | No. of rooms having double/two bed/room & Area of room in sq.m | ||||||||
1 | Boys 2 & 18 | 3 | Boys Hostel | 120 & 12 | ||||||||
2 | Girls 0 & 0 | |||||||||||
Renewable Energy Related Details/Conservation of Energy Details | ||||||||||||
Sr.No | Particulars | Details Provided by Institute | ||||||||||
1 | Total land available (in Sqm) | 10000 | ||||||||||
2 | No.of building with roof tops. | 5 | ||||||||||
3 | Annual electricity consumption (No. of units) during previous financial year. | 300 | ||||||||||
4 | Electricity bill average rate per unit paid during previous financial year (Rs/unit) & No.of units used | 10 | ||||||||||
5 | Renewable Energy if any used at present | No | ||||||||||
6 | Land available for placing solar photovoltaic panels (in sqm) | 75 | ||||||||||
7 | Total approximate roof-top area available for placing solar photovoltaic panel (in Sqm) | 5000 | ||||||||||
8 | Whether a policy has been adopted to use only LED lamps. | yes | ||||||||||
9 | Remark | Presently 5 kw solar Panel installed and order for 3 kw was also placed and is likely to be installed soon in hostal. | ||||||||||
Other Facilities | ||||||||||||
All weather Approach (Motorized Road) | yes | Backup Electric supply | yes | |||||||||
Barrier free Environment | yes | CCTV Security | yes | |||||||||
ERP software | No | Electric Supply | yes | |||||||||
General Insurance | yes | Group Insurance | yes | |||||||||
Institution web site | yes | Insurance for students | yes | |||||||||
Internal Quality Assurance cell | yes | Fire and safety Certificate | yes | |||||||||
media cell | yes | Backup Electric supply | yes | |||||||||
Medical & counselling facilities | yes | Notice Boards | yes | |||||||||
Public Announcement system | yes | Potable water supply | yes | |||||||||
Post & Banking/ATM | No | Projectors in classrooms | yes | |||||||||
Sewage Disposal system | yes | Staff Quarters | yes | |||||||||
Sports facilites | yes | Auditorium | yes | |||||||||
Intellectual Property Right cell | No | Innovation Cell/Club | yes | |||||||||
Pricipal/Director/Registar | ||||||||||||
Surname | Tantuway | First Name | Kailash | |||||||||
Father’s Name | Laxmi Prasad | Date of Birth | 1/2/1981 | |||||||||
Doctorate Degree | No | Field of Specialization | Technical Education | |||||||||
Master’s Degree | No | Bachelor Degree | B.E(Electrical) | |||||||||
Other Qualifications | Diploma (Electrical) | Date of joining the Institute as head | 21/12/2009 | |||||||||
Appointment Type | Incharge | Exact Desination | Principal | |||||||||
Experience (T-R-I) | Teaching-10 | Industry | No | |||||||||
Faculty | ||||||||||||
Institute Level Faculty | ||||||||||||
Type | Actual No. | Required No. as per CI | Deficiency | |||||||||
Total Faculty (UG+PG+Diploma) | 36 | 47 | yes | |||||||||
Administrative Area | ||||||||||||
Type | Actual Room Area (Sq.m) | Expected Room Area (Sq.m) | Deficiency | |||||||||
Principal/Director office | 65 | 30 | No | |||||||||
Board Room | 45 | 20 | No | |||||||||
Office All Inclusive | 157 | 150 | No | |||||||||
Department offices/Cabin for Head of Dept. | 341 | 120 | No | |||||||||
Central Store | 144 | 30 | No | |||||||||
Maintenance | 39 | 10 | No | |||||||||
Security | 10 | |||||||||||
Housekeeping | 15 | |||||||||||
Pantry for Staff/Faculty | 116 | |||||||||||
Exam Control Office | 30 | |||||||||||
Training Placement Office | 80 | |||||||||||
Total | 1042 | |||||||||||
Amenities Area | ||||||||||||
Type | Actual Room Area (Sq.m) | |||||||||||
Boys Common Room | 77 | |||||||||||
Girls Common Room | 77 | |||||||||||
Cafeteria | 151.3 | |||||||||||
Stationery Store | 37.84 | |||||||||||
First aid cum Sick Room | 25 | |||||||||||
Total | 368.14 |