LOADING...

Infrastructure

Infrastructure

The Polytechnic is functioning in a well laid out campus with shady trees. The classrooms, Laboratories and all student amenities are housed in a 12,000 square feet of Buildings. A well-planned layout of playground supplements the extra curricular activities of the students.

The college has a Boys Hostel, Computer Lab, Library & Reading Room, Language Laboratory, Boys Hostel, CCTV Security, Electric Supply, Group Insurance, Insurance for students, Fire and safety Certificate, Backup Electric supply, Notice Boards, Potable water supply, Projectors in classrooms, Staff Quarters, Auditorium, Innovation Cell/Club, Playground and more.

Land Registered withRevenueLand Place Area 1 in acres63    
Land ownership detailsGovrnment LnadLand Place Area 2 in acresNA    
Total area in acres63Land Place Area 3 in acresNA    
Land Registered Date2/2/1983Land Use Certificate issued byTehsidar    
Land Use Certificate Date2/2/1983Latitude and LongitudeLatitude-24,3,49 Longitude- 82, 35, 18   
Mortgage Details (if any )NoPurpose of MortgageNo    
FSIData Not Provided by the InstituteBulid up Area (Sgm)     
Additional land for Merger or New Program      
Other land Details       
Sr.No.1Land Registration No.Governmment land    
Date of Registration2/2/1983Area of Land (acres1    
Khasra Numbergovernment LandPlot Number, Survey NumberGovernmment land    
Land Situated atPachoreLand Registration in the name ofyes    
Type of ownership ( Sales deed/Gift deed/Govt/Private LeaseOwnershipLand Use Certificate issued byYes    
In case of Private Lease-Name of the LeaserName of the Leasee     
Land use Certificate issuing AuthorityTeshsildarIs the Land Mortgagedno    
Details of Land if the land is MortgagedData Not Provided by the InstituteLand required at the time of First AICTE approved (In Acres)5    
Land avaliable at the time of First AICTE approval (In Acres)63      
Building Details       
Buliding StatusAvailableTotal built up Area (Sqm) Planned10000    
Total built up Area (Sqm) ready9646Total Carpet Area (Sqm) Instructional-ready6646    
Total Carpet Area (Sqm) Administrative-Ready747Total Carpet Area (Sqm) Amenities-ready3000    
Access and Circulation Area (Sqm)Data Not Provided by the InstituteActivities in the building other than courses approved by AICTEMES Program    
Whether Tollet Area is maintained as per National Building Code(NBC) Norms?Data Not Provided by the InstituteWhether Access and circulation Area is maintained as per National Bullding code (NBC) Norms?Data not provided by the Institute   
Funds Position for Building Construction(Rs in Lakhs)      
LoansData Not Provided by the Instituteown shareData not provided by the InstituteFunds allocatedData Not Provided by the Institute
Other Building Details      
Programme and Courses      
Sr.No.1Coures Unique Id1-1591003116ProgrammeEngineering Technology
LevelDIPLOMACouresMechanical EngineeringShift1st Shift  
FT/PTFull TimeStarted in1984Applying ForEoA only  
Course Duration3Current Intake ( 2018-19)60Applying For intake (2019-20)60  
NRINot interestUniversity BoardRajiv Gandhi Proudyogiki Vishwvidyalaya BhoplPIO/FN/Gulf Quota approval statuts OCINot interested 
Twining Program RequestNot interestNBA Accreditation status (As on 10th April 2018no  
Sr.No.2Course Unique Id1-1591003219ProgrammeEngineering Technology
LevelDIPLOMACoursesElectrical EngineeringShift1st Shift  
FT/PTFull TimeStarted in1983Applying ForEoA only  
Course Duration3Current Intake ( 2018-19)60Applied for Intake (2019-20)60  
NRINot interestUniversity BoardRajiv Gandhi Proudyogiki Vishwvidyalaya BhoplPIO/FN/Gulf Quota approval statuts OCINot interested 
Twining Program RequestNot interestNBA Accreditation status (As on 10th April 2018No  
Sr.No.3Course Unique Id1-1591003280ProgrammeEngineering Technology
LevelDIPLOMACourseComputer Science & EngineeringShift1st Shift  
FT/PTFull TimeStarted in2006Applying forEoA only  
Course Duration3Current Intake ( 2018-19)60Applied for Intake (2019-20)60  
NRINot interestedUniversity BoardRajiv Gandhi Proudyogiki Vishwvidyalaya BhoplPIO/FN/Gulf Quota approval statuts OCINot interested 
Twining Program RequestNot interestNBA Accreditation status (As on 10th April 2018No  
Sr.No.4Course Unique Id1-1591003333ProgrammeEngineering Technology
LevelDIPLOMACourseElctronics & Tele-Communication EngineeringShift1st Shift  
FT/PTFull TimeStarted in2009Applying forEoA only  
Course Duration3Current Intake ( 2018-19)60Applied for Intake (2019-20)60  
NRINot interestedUniversity BoardRajiv Gandhi Proudyogiki Vishwvidyalaya BhoplPIO/FN/Gulf Quota approval statuts OCINot interested 
Twining Program RequestNot interestNBA Accreditation status (As on 10th April 2018No  
Sr.No.5Course Unique Id1-1591003448ProgrammeEngineering Technology
LevelDIPLOMACourseMining & Mine SurveyeingShift1st Shift  
FT/PTFull TimeStarted in2006Applying forEoA only  
Course Duration3Current Intake ( 2018-19)60Applied for Intake (2019-20)60  
NRINot interestedUniversity BoardRajiv Gandhi Proudyogiki Vishwvidyalaya BhoplPIO/FN/Gulf Quota approval statuts OCINot interested 
Twining Program RequestNot interestNBA Accreditation status (As on 10th April 2018No  
Sr.No.6Course Unique Id1-1591104795ProgrammeEngineering Technology
LevelDIPLOMACourseCivil EngineeringShift1st Shift  
FT/PTFull TimeStarted in2009Applying forEoA only  
Course Duration3Current Intake ( 2018-19)45Applied for Intake (2019-20)45  
NRINot interestedUniversity BoardRajiv Gandhi Proudyogiki Vishwvidyalaya BhoplPIO/FN/Gulf Quota approval statuts OCINot interested 
Twining Program RequestNot interestNBA Accreditation status (As on 10th April 2018No  
Sr.No.7Course Unique Id1-1612965134ProgrammeEngineering Technology
LevelDIPLOMACourseMechanical EngineeringShift1st Shift  
FT/PTFull TimeStarted in2006Applying forEoA only  
Course Duration4Current Intake ( 2018-19)30Applied for Intake (2019-20)30  
NRINot interestedUniversity BoardRajiv Gandhi Proudyogiki Vishwvidyalaya BhoplPIO/FN/Gulf Quota approval statuts OCINot interested 
Twining Program RequestNot interestNBA Accreditation status (As on 10th April 2018No  
Sr.No.8Course Unique Id1-1613002067ProgrammeEngineering Technology
LevelDIPLOMACourseElectrical EngineeringShift1st Shift  
FT/PTFull TimeStarted in2006Applying forEoA only  
Course Duration4Current Intake ( 2018-19)30Applied for Intake (2019-20)30  
NRINot interestedUniversity BoardRajiv Gandhi Proudyogiki Vishwvidyalaya BhoplPIO/FN/Gulf Quota approval statuts OCINot interested 
Twining Program RequestNot interestNBA Accreditation status (As on 10th April 2018No  
        
Programme and Courses to Change Course Name      
Dual Degree/Intergrated Course Details      
Data not entered by Institute      
Voxational Course Details      
Data not entered by Institute      
Instructional Area       
Sr.NoProgrammeLevelBuilding No.Building NameRoom TypeRoom No.Average Crpet Area (Sqm)FlooringWall & PaintingElec & lightingFurniture & Fixtures
1Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteLaboratoryB-1587.43ReadyReadyReadyReady 
2Engineering and TechnologyDiploma34GPC WAIDHA NLaboratoryB-16117.04ReadyReadyReadyReady 
3Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteLaboratoryB-17117.04ReadyReadyReadyReady 
4Engineering and TechnologyDiploma34GPC WAIDHA NWorkshopBLACKSMIT HY SHOP116.1ReadyReadyReadyReady 
5Engineering and TechnologyDiploma34GPC WAIDHA NLaboratoryCAD CAM LAB75.68ReadyReadyReadyReady 
6Engineering and TechnologyDiploma34GPC WAIDHA NWorkshopCARPENTARY SHOP116.1ReadyReadyReadyReady 
7Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteClassroomE-876.56ReadyReadyReadyReady 
8Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteClassroomE-976.56ReadyReadyReadyReady 
9Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteClassroomE-1156.64ReadyReadyReadyReady 
10Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteLaboratoryE-1498.2ReadyReadyReadyReady 
11Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteLaboratoryE-16116.2ReadyReadyReadyReady 
12Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteLaboratoryE-17117.04ReadyReadyReadyReady 
13Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteLaboratoryE-18117.04ReadyReadyReadyReady 
14Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteClassroomE-276.56ReadyReadyReadyReady 
15Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteClassroomE-376.56ReadyReadyReadyReady 
16Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteClassroomE-476.56ReadyReadyReadyReady 
17Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteDrawing HallE-8148.2ReadyReadyReadyReady 
18Engineering and TechnologyDiploma34Electrical wingLaboratoryELECTRICAL POWER LAB116.16ReadyReadyReadyReady 
19Engineering and TechnologyDiploma34Electrical wingLaboratoryELECTRONICS LAB98.2ReadyReadyReadyReady 
20Engineering and TechnologyDiploma34GPC WAIDHA NWorkshopFITTING SHOP161.1ReadyReadyReadyReady 
21Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteLaboratoryG-10116.56ReadyReadyReadyReady 
22Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteLaboratoryG-12155.76ReadyReadyReadyReady 
23Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteClassroomG-1376.56ReadyReadyReadyReady 
24Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteClassroomG-1476.56ReadyReadyReadyReady 
25Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteClassroomG-376.56ReadyReadyReadyReady 
26Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteLaboratoryG-4117.04ReadyReadyReadyReady 
27Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteLaboratoryG-5117.04ReadyReadyReadyReady 
28Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteClassroomG-676.56ReadyReadyReadyReady 
29Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteClassroomG-776.56ReadyReadyReadyReady 
30Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteClassroomG-8156.64ReadyReadyReadyReady 
31Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteClassroomG-9155.76ReadyReadyReadyReady 
32Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteLaboratoryM-696.44ReadyReadyReadyReady 
33Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteLaboratoryM-7116.56ReadyReadyReadyReady 
34Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteClassroomM-8116.16ReadyReadyReadyReady 
35Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteLaboratoryM-9116.16ReadyReadyReadyReady 
36Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteClassroomM-10 A76.56ReadyReadyReadyReady 
37Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteClassroomM-10 B76.56ReadyReadyReadyReady 
38Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteLaboratoryM-11116.56ReadyReadyReadyReady 
39Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteClassroomM-12155.76ReadyReadyReadyReady 
40Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteClassroomM-1376.56ReadyReadyReadyReady 
41Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteLaboratoryM-14116.56ReadyReadyReadyReady 
42Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteSeminar HallM-4146.2ReadyReadyReadyReady 
43Engineering and TechnologyDiplomaData Not Provided by the InstituteData Not Provided by the InstituteTutorial RoomM-5146.2ReadyReadyReadyReady 
44Engineering and TechnologyDiploma34GPC WAIDHA NWorkshopMACHINE SHOP161.1ReadyReadyReadyReady 
45Engineering and TechnologyDiploma34GPC WAIDHA NWorkshopMOULDING SHOP161.1ReadyReadyReadyReady 
46Engineering and TechnologyDiploma34GPC WAIDHA NWorkshopWELDING SHOP161.1ReadyReadyReadyReady 
47Engineering and TechnologyDiploma34GPC WAIDHA NWorkshopWORK SHOP-1161.1ReadyReadyReadyReady 
48Engineering and TechnologyDiploma34GPC WAIDHA NWorkshopWORK SHOP-2161.1ReadyReadyReadyReady 
49Engineering and TechnologyDiploma34GPC WAIDHA NWorkshopWORK SHOP-3161.1ReadyReadyReadyReady 
50Engineering and TechnologyDiploma34GPC WAIDHA NWorkshopWORK SHOP-4161.1ReadyReadyReadyReady 
51Engineering and TechnologyDiploma34GPC WAIDHA NWorkshopWORK SHOP-5161.1ReadyReadyReadyReady 
             
Instructional Area Common Facilities           
Sr.No Building No.Building NameRoom TypeRoom IdArea (Sqm)FlooringWall & PaintingElec & lightingFurniture & Fixtures 
134GPC, Waidhancomputer centreB-177.43ReadyReadyReadyReady   
234GPC, Waidhancomputer centreB-237.38ReadyReadyReadyReady   
334GPC, Waidhancomputer centreB-3117.04ReadyReadyReadyReady   
434GPC, WaidhanLibrary & Reading roomL-1319.8ReadyReadyReadyReady   
534GPC, Waidhancomputer centreL-3216.56ReadyReadyReadyReady   
634GPC, WaidhanLanguage LaboratoryL-466ReadyReadyReadyReady   
             
Administrative Area            
Sr.No Building No.Building NameRoom TypeRoom IdArea (Sqm)FlooringWall & PaintingElec & lightingFurniture & Fixtures 
1Data Not Provided by the InstituteData Not Provided by the InstituteMaintenanceE-139.6ReadyReadyReadyReady   
2Data Not Provided by the InstituteData Not Provided by the InstituteCabin for Head of Dept.E-236.96ReadyReadyReadyReady   
3Data Not Provided by the InstituteData Not Provided by the InstituteCabin for Head of Dept.E-317.64ReadyReadyReadyReady   
4Data Not Provided by the InstituteData Not Provided by the InstituteCabin for Head of Dept.E-468.88ReadyReadyReadyReady   
5Data Not Provided by the InstituteData Not Provided by the InstituteCabin for Head of Dept.E-517.64ReadyReadyReadyReady   
6Data Not Provided by the InstituteData Not Provided by the InstituteHousekeepingE-915ReadyReadyReadyReady   
7Data Not Provided by the InstituteData Not Provided by the InstitutePrincipal Director officeG-165.06ReadyReadyReadyReady   
8Data Not Provided by the InstituteData Not Provided by the InstituteExam control officeG-1,130.15ReadyReadyReadyReady   
             
Computational Facility           
Sr.NoLegal System softwareLegal Apllication softwareInternet Bandwidth in MbpsInternet Contention RatioPCs/Laptop exclusively available to studentsPCs/Laptop exclusively available in Administrative officeNo. of PCs/Laptop available in LibraryNo. of PCs/Laptop in language labPCs/Laptop available to faculty members
1422101:021405508   
             
Hostel Facility            
Sr.NoNo. of rooms having single bed/room & Area of room in sq.mBuilding No.Name of BuildingNo. of rooms having double/two bed/room & Area of room in sq.m    
1Boys 2 & 183Boys Hostel120 & 12        
2Girls 0 & 0           
             
Renewable Energy Related Details/Conservation of Energy Details          
Sr.NoParticularsDetails Provided by Institute         
1Total land available (in Sqm)10000          
2No.of building with roof tops.5          
3Annual electricity consumption (No. of units) during previous financial year.300          
4Electricity bill average rate per unit paid during previous financial year (Rs/unit) & No.of units used10          
5Renewable Energy if any used at presentNo          
6Land available for placing solar photovoltaic panels (in sqm)75          
7Total approximate roof-top area available for placing solar photovoltaic panel (in Sqm)5000          
8Whether a policy has been adopted to use only LED lamps.yes          
9RemarkPresently 5 kw solar Panel installed and order for 3 kw was also placed and is likely to be installed soon in hostal.     
Other Facilities            
All weather Approach (Motorized Road)yesBackup Electric supplyyes         
Barrier free EnvironmentyesCCTV Securityyes         
ERP softwareNoElectric Supplyyes         
General InsuranceyesGroup Insuranceyes         
Institution web siteyesInsurance for studentsyes         
Internal Quality Assurance cellyesFire and safety Certificateyes         
media cellyesBackup Electric supplyyes         
Medical & counselling facilitiesyesNotice Boardsyes         
Public Announcement systemyesPotable water supplyyes         
Post & Banking/ATMNoProjectors in classroomsyes         
Sewage Disposal systemyesStaff Quartersyes         
Sports facilitesyesAuditoriumyes         
Intellectual Property Right cellNoInnovation Cell/Clubyes         
             
Pricipal/Director/Registar           
SurnameTantuwayFirst NameKailash         
Father’s NameLaxmi PrasadDate of Birth1/2/1981         
Doctorate DegreeNoField of SpecializationTechnical Education         
Master’s DegreeNoBachelor DegreeB.E(Electrical)         
Other QualificationsDiploma (Electrical)Date of joining the Institute as head21/12/2009         
Appointment TypeInchargeExact DesinationPrincipal         
Experience (T-R-I)Teaching-10IndustryNo         
             
Faculty            
Institute Level Faculty           
TypeActual No.Required No. as per CIDeficiency         
Total Faculty (UG+PG+Diploma)3647yes         
             
Administrative Area            
TypeActual Room Area (Sq.m)Expected Room Area (Sq.m)Deficiency         
Principal/Director office6530No         
Board Room4520No         
Office All Inclusive157150No         
Department offices/Cabin for Head of Dept.341120No         
Central Store14430No         
Maintenance3910No         
Security10           
Housekeeping15           
Pantry for Staff/Faculty116           
Exam Control Office30           
Training Placement Office80           
Total1042           
Amenities Area            
TypeActual Room Area (Sq.m)           
Boys Common Room77           
Girls Common Room77           
Cafeteria151.3           
Stationery Store37.84           
First aid cum Sick Room25           
Total368.14           
Copyright©2025,Government Polytechnic College, Waidhan.
All Rights Reserved.
Last Updated on: May 17th, 2025
Visitors: 10508
Scroll to Top
Scroll to Top